# BMS & HVAC Controls Toronto | Toronto Commercial HVAC

> BMS install, retrofit and programming in Toronto: Johnson Controls Metasys, Siemens Desigo, Honeywell Niagara, Delta. VFD retrofits, BACnet and Modbus. $15K-$180K.

URL: https://torontocommercialhvac.ca/commercial-bms-controls/

Building Systems $15K-$180K

# Commercial BMS & HVAC Controls in Toronto, ON | Building Management Integration, VFD Retrofit & Thermostat Programming | Johnson Controls, Siemens, Honeywell, Delta

Last updated: October 10, 2026

Building management system installation, retrofit and programming for office towers, institutions and industrial sites. We work on Johnson Controls Metasys, Siemens Desigo, Honeywell Niagara and Delta Controls over BACnet and Modbus, and VFD retrofits typically pay back in 3-5 years.

BMS install, retrofit and programming for towers, institutions and industrial sites. $15K-$180K.

-   BACnet and Modbus integration
-   VFD retrofits on fans and pumps
-   Schedule and setpoint optimization
-   Alarm and trend set-up

Call (437) 524-2997

[tel:+14375242997 →](tel:+14375242997)

 

Request Service

[/contact/ →](/contact/)

 

View pricing

[#pricing →](#pricing)

![Controls technicians wiring a building automation panel in a Toronto tower](/images/misc/two-controls-technicians-wiring-a-bacnet-building-.webp)

Quick Facts

Pricing

$15K-$180K

Emergency response

2-4 hours, 24/7

Labour warranty

90 days repair / 2 years install

Program lead

Marco Russo, Chiller Specialist

Commercial Credentials & Verification

TSSA G1 + G2

Licensed Gas Technicians

ESA

Electrical Safety Authority

313A Refrigeration

Licensed Refrigeration Mechanics

$5M CGL + WSIB

Enbridge-Authorized Since 2006

2-4 Hour Emergency Response 90-Day Labour Warranty on Repairs / 2-Year on Installs 5-Star Commercial Satisfaction 20+ Years Commercial-Only

Toronto Commercial HVAC

[/ →](/)

 installs, upgrades, programs and services building management systems and HVAC controls for office towers, institutions, hospitals and industrial sites across Toronto and the GTA. We work on Johnson Controls Metasys, Siemens Desigo, Honeywell Niagara and Delta Controls, and integrate equipment over BACnet IP, BACnet MSTP and Modbus RTU.

Most buildings get far less from their BAS than they paid for. Schedules are overridden and forgotten, so equipment runs all weekend. Alarm lists fill with nuisance alerts until operators stop reading them. Sensors drift and VAV controllers fail, so comfort calls pile up. Constant-speed fans and pumps run flat out whatever the load. Fixing controls is often the cheapest energy and comfort upgrade a building can make.

Controls projects typically run $15,000 to $180,000. VFD retrofits typically pay back in 3-5 years.

## What Does BMS and Controls Work Include?

### Controls audit and tune-up

Point list review, override clean-up, schedule and setpoint optimization, alarm rationalization, trend set-up and sensor recalibration.

### VFD retrofits

Variable frequency drives on supply fans, return fans, cooling tower fans and pumps, with control sequences and BAS points.

### Integration

New rooftop units, chillers, boilers, make-up air units and VRF systems tied into the existing BAS over BACnet or Modbus.

### Upgrades and new installs

Controller replacement, new front ends, graphics and complete BMS installations for new buildings and major retrofits.

## Controls Projects and Typical Payback

| Project | Typical cost | Typical payback |
| --- | --- | --- |
| Schedule and override clean-up | Part of $15K-$40K tune-up | Often under 1 year |
| VFDs on fans and pumps | $20K-$90K | 3-5 years |
| Chiller plant sequence optimization | Quoted | 2-4 years |
| Full BMS upgrade | $60K-$180K | Varies with scope |

## Signs Your Controls Need Attention

-   Equipment running nights and weekends with no one in the building.
-   Hundreds of overrides or alarms nobody acts on.
-   Chronic hot and cold complaints in the same zones.
-   New equipment that never got integrated into the BAS.
-   Energy use climbing with no change in occupancy.

## Controls and the Plant

Chiller plant sequences, condenser water reset and cooling tower fan control drive a large share of tower energy. Our controls team works directly with our 

commercial chiller service

[/commercial-chiller-service/ →](/commercial-chiller-service/)

 and 

cooling tower service

[/cooling-tower-service/ →](/cooling-tower-service/)

 crews so sequences match the equipment. New installs are integrated through our 

commercial HVAC installation

[/commercial-hvac-installation/ →](/commercial-hvac-installation/)

 projects.

## BMS and Controls Across Toronto and the GTA

We work in Bay Street and Yonge corridor office towers, downtown hospitals and universities, Scarborough and Etobicoke institutions, Hwy 404 tech campuses in Markham and industrial plants in Vaughan and Brampton. Office portfolios can see our 

commercial HVAC for offices

[/commercial-hvac-for-offices/ →](/commercial-hvac-for-offices/)

 programs.

Transparent Pricing

## How Much Does Commercial BMS & HVAC Controls Cost in Toronto?

Controls Tune-Up

$15K-$40K

Schedules, setpoints, alarms, trends and sensor recalibration on an existing BAS.

-   Override clean-up
-   Alarm rationalization
-   Trend set-up

Book This

[tel:+14375242997 →](tel:+14375242997)

Most Requested

VFD Retrofit

$20K-$90K

Drives on fans and pumps with control sequences and BAS points.

-   3-5 year typical payback
-   Incentive paperwork
-   Commissioning

Book This

[tel:+14375242997 →](tel:+14375242997)

BMS Upgrade or New Install

$60K-$180K

Controller replacement, new front end, integration of RTUs, plant and VAV.

-   BACnet and Modbus
-   Graphics and trends
-   Operator training

Book This

[tel:+14375242997 →](tel:+14375242997)

Controls pricing depends on point count, platform, existing network, integration scope and whether hardware is replaced or reused. Service calls for programming and troubleshooting are billed hourly after assessment.

Why Us

## Why Choose Toronto Commercial HVAC for BMS & Controls?

### Mechanical and Controls Together

Our controls team works beside our chiller and RTU crews, so sequences match how the equipment really behaves.

### Four Major Platforms

Johnson Controls Metasys, Siemens Desigo, Honeywell Niagara and Delta Controls.

### Open Protocols

BACnet IP, BACnet MSTP and Modbus RTU integration, so new equipment talks to the existing BAS.

### VFD Payback

Variable speed drives on fans and pumps typically pay back in 3-5 years, often faster with incentives.

### Alarms You Can Trust

Alarm lists cleaned up so the alarms that matter are not buried under nuisance alerts.

### Trends That Find Problems

Trend logs set up to catch failing VAVs, short cycling and plant drift before tenants call.

## Repair or replace? Get the numbers first.

A $185 diagnostic gives you written findings per unit, waived when the approved repair is over $750.

(437) 524-2997

[tel:+14375242997 →](tel:+14375242997)

 

Request Service

[/contact/ →](/contact/)

Process

## How Does Our BMS & Controls Process Work?

1.  01
    
    ### Controls Audit
    
    Point list, controller inventory, network, overrides, alarms and trends reviewed.
    
2.  02
    
    ### Savings and Scope
    
    Quick wins, VFD candidates and upgrade options with costs and payback in writing.
    
3.  03
    
    ### Design and Program
    
    Sequences of operation, graphics, alarms and trends designed for how the building actually runs.
    
4.  04
    
    ### Install and Integrate
    
    Controllers, drives and integration installed and tested. Marco Russo, Chiller Specialist, signs off plant sequences.
    
5.  05
    
    ### Commission and Train
    
    Point-to-point checkout, sequence testing, operator training and a commissioning report.
    

Field Photos

## BMS & Controls Work on Toronto Commercial Sites

 

Track Record

## Related Commercial Projects

All projects

[/projects/ →](/projects/)

![Technicians rebuilding a centrifugal chiller in a Bay Street office tower mechanical room](/images/featured/three-technicians-in-hard-hats-rebuilding-a-trane-.webp)

[/projects/bay-street-office-tower-chiller-rebuild/ →](/projects/bay-street-office-tower-chiller-rebuild/)

Downtown Toronto $148,000

### 

Bay Street Office Tower 2x 100-ton Centrifugal Chiller Rebuild

[/projects/bay-street-office-tower-chiller-rebuild/ →](/projects/bay-street-office-tower-chiller-rebuild/)

Two centrifugal chillers rebuilt in sequence with full eddy current testing, new bearings and seals, and refrigerant handled under ASHRAE Guideline 3. The tower stayed on its 10-year PM program and logged an 18% plant energy reduction after the 2024 compressor rebuild.

Building Systems 

Case study

[/projects/bay-street-office-tower-chiller-rebuild/ →](/projects/bay-street-office-tower-chiller-rebuild/)

![Technicians installing VRF indoor units in a Markham office fit-out](/images/featured/two-technicians-on-ladders-installing-a-vrf-ceilin.webp)

[/projects/markham-tech-campus-vrf-fit-out/ →](/projects/markham-tech-campus-vrf-fit-out/)

Markham $215,000

### 

Markham Tech Campus VRF Fit-Out 24 Indoor Units

[/projects/markham-tech-campus-vrf-fit-out/ →](/projects/markham-tech-campus-vrf-fit-out/)

A two-floor VRF heat recovery fit-out delivered on the tenant improvement schedule, with zone-level control for open office, meeting rooms and a small server room.

Replacement 

Case study

[/projects/markham-tech-campus-vrf-fit-out/ →](/projects/markham-tech-campus-vrf-fit-out/)

Client Feedback

## What Clients Say About Our BMS & Controls

5-Star Commercial Satisfaction

> "The VFDs and new sequences cut our fan and pump energy noticeably in the first year, and the incentive covered a good part of the cost."

Wei Zhang

Energy Manager, Hospital outpatient building

Scarborough

VFD retrofit on 6 AHU fans and 4 pumps with BAS sequences$86,000

> "We had over two hundred overrides nobody could explain. After the tune-up, the alarm screen means something again."

Patricia Holm

Chief Building Engineer, 18-storey office tower

Downtown Toronto

Metasys tune-up: schedules, overrides, alarms and trends$27,500

> "All twelve rooftop units and both make-up air units now show up on one screen with alarms to our phones."

Gregory Baines

Facilities Manager, Light manufacturing plant with offices

Vaughan

Niagara integration of 12 RTUs and 2 MUAs$42,000

Straight Answers

## BMS & Controls FAQs

### How much does a commercial BMS or controls project cost in Toronto?

+

Commercial BMS and controls projects in Toronto typically run $15,000 to $180,000. A controls tune-up on an existing system, covering schedules, setpoints, overrides, alarms, trends and sensor recalibration, usually costs $15,000 to $40,000. VFD retrofits on supply fans, return fans and pumps typically run $20,000 to $90,000 and often pay back in 3-5 years. Full BMS upgrades or new installs with new controllers, a new front end and integration of rooftop units, plant and VAV run $60,000 to $180,000. The biggest variables are point count, platform, network condition and how much existing hardware can be reused.

### Which BMS platforms do you work on?

+

Johnson Controls Metasys, Siemens Desigo, Honeywell Niagara and Delta Controls. We integrate other equipment over BACnet and Modbus.

### What is a VFD retrofit and why does it save energy?

+

A variable frequency drive lets a fan or pump motor run only as fast as the load needs. Because fan and pump power drops sharply with speed, even modest speed reductions save a lot of energy. Retrofits on constant-speed fans and pumps typically pay back in 3-5 years.

### Can you integrate new rooftop units into our existing BAS?

+

Yes. Most modern RTU controllers support BACnet. We integrate points, alarms and schedules at start-up.

### Our BAS is full of overrides. Can you fix that?

+

Yes. Overrides, stale schedules and nuisance alarms are the most common problems we find. A tune-up clears them and documents why each remaining override exists.

### Do you offer BAS service contracts?

+

Yes. Ongoing support for programming changes, alarm response and trend reviews, often bundled with mechanical PM.

### Are there incentives for controls and VFD projects?

+

Often. Enbridge and IESO programs support controls and VFD measures. We help with pre-approval paperwork.

### Can you take over from our original controls contractor?

+

In many cases, depending on platform licensing and access. We assess what is needed before committing.

### Do you provide operator training?

+

Yes. Every project ends with operator training on graphics, alarms, trends and schedules.

### How do controls connect to tenant comfort?

+

Failed VAV controllers, bad sensors and poor schedules cause most chronic hot and cold calls. Trend data shows the problem zones before tenants do.

Free Tools

## Try the Commercial Cooling Energy Cost Estimator

Estimate monthly and annual electricity cost for rooftop units and chillers, and see what a higher-efficiency replacement could save.

Use calculator

[Try the Commercial Cooling Energy Cost Estimator →](/tools/energy-cost-estimator/)

Keep Exploring

## Related Services

![Chiller technicians working on a centrifugal chiller in a Toronto tower mechanical room](/images/misc/three-chiller-technicians-in-hard-hats-working-on-.webp)

[/commercial-chiller-service/ →](/commercial-chiller-service/)

### 

Commercial Chiller Service

[/commercial-chiller-service/ →](/commercial-chiller-service/)

$4,500-$450K

Chiller repair, rebuild and replacement for towers and institutions, 20-500 tons.

View service

[/commercial-chiller-service/ →](/commercial-chiller-service/)

![Technicians inspecting a chiller in a Bay Street office tower mechanical penthouse](/images/misc/two-technicians-in-hard-hats-inspecting-a-centrifu.webp)

[/commercial-hvac-for-offices/ →](/commercial-hvac-for-offices/)

### 

Commercial HVAC for Offices

[/commercial-hvac-for-offices/ →](/commercial-hvac-for-offices/)

$4,500+ assess

Chiller plants, cooling towers, VAV, BAS and tenant response for A-class and B-class offices.

View service

[/commercial-hvac-for-offices/ →](/commercial-hvac-for-offices/)

![Installers running piping and ductwork for a new commercial HVAC system in a Toronto office fit-out](/images/misc/three-installers-in-hard-hats-setting-refrigerant-.webp)

[/commercial-hvac-installation/ →](/commercial-hvac-installation/)

### 

Commercial HVAC Installation

[/commercial-hvac-installation/ →](/commercial-hvac-installation/)

$18K-$450K

New-build and retrofit installs: RTU sets, chiller plants, boiler rooms, VAV and VRF fit-outs.

View service

[/commercial-hvac-installation/ →](/commercial-hvac-installation/)

![Technicians inspecting a cooling tower fan deck on a downtown Toronto roof](/images/misc/two-technicians-in-hard-hats-inspecting-the-fan-de.webp)

[/cooling-tower-service/ →](/cooling-tower-service/)

### 

Cooling Tower Service

[/cooling-tower-service/ →](/cooling-tower-service/)

$2,800-$45K

Tower repair, water treatment and legionella programs for open and closed loop towers.

View service

[/cooling-tower-service/ →](/cooling-tower-service/)

![](/images/misc/two-commercial-hvac-technicians-in-hard-hats-walki.webp)

24-Hour Commercial Emergency Dispatch

## Ready to Book BMS & Controls?

Commercial BMS & HVAC Controls across Toronto and the GTA: $15K-$180K, written findings before any work, and a 2-4 hour emergency response.

Call (437) 524-2997

[tel:+14375242997 →](tel:+14375242997)

 

Request Service

[/contact/ →](/contact/)

-   TSSA G1+G2, ESA, 313A
-   Written findings every visit
-   90-day / 2-year labour warranty
