# Brampton Industrial Chiller Plant Legionella Retrofit

A process cooling tower brought back into a documented legionella control program, with new fill, new drift eliminators and automated treatment, done inside a one-week plant shutdown.

Cooling tower and chiller plant retrofit at a Hwy 410 manufacturing plant: new fill and drift eliminators, basin cleanout, automated biocide feed, sampling program and compliance records.

![Technicians replacing fill media in a Brampton industrial cooling tower](/images/featured/two-technicians-in-hard-hats-replacing-fill-media-.webp)

The Challenge

## What the Building Needed

The tower had heavy scale on the fill, damaged drift eliminators and manual chemical dosing with patchy records. The plant needed a defensible legionella program and could only shut down process cooling for one week.

Our Approach

## How We Did It

1.  01 Planned the full scope before the shutdown so parts and crews were on site day one.
2.  02 Removed and disposed of scaled fill, cleaned and disinfected the basin, and installed new fill and drift eliminators.
3.  03 Installed automated chemical and biocide feed with conductivity control.
4.  04 Set up routine sampling and a written records binder for the tower.

Results

## Measured Outcomes

-   Retrofit completed inside the one-week shutdown
-   Clean first sample after restart
-   Written legionella control records kept per tower

> "They finished inside our shutdown week and handed us a records binder our auditor actually liked. The tower runs cleaner than it has in years."

Ian MacLeod, Plant Manager

Site Photos

## On the Job

 

More Projects

## Related Projects

![Technicians rebuilding a centrifugal chiller in a Bay Street office tower mechanical room](/images/featured/three-technicians-in-hard-hats-rebuilding-a-trane-.webp)

[/projects/bay-street-office-tower-chiller-rebuild/ →](/projects/bay-street-office-tower-chiller-rebuild/)

Downtown Toronto $148,000

### 

Bay Street Office Tower 2x 100-ton Centrifugal Chiller Rebuild

[/projects/bay-street-office-tower-chiller-rebuild/ →](/projects/bay-street-office-tower-chiller-rebuild/)

Two centrifugal chillers rebuilt in sequence with full eddy current testing, new bearings and seals, and refrigerant handled under ASHRAE Guideline 3. The tower stayed on its 10-year PM program and logged an 18% plant energy reduction after the 2024 compressor rebuild.

Building Systems 

Case study

[/projects/bay-street-office-tower-chiller-rebuild/ →](/projects/bay-street-office-tower-chiller-rebuild/)

![](/images/misc/two-commercial-hvac-technicians-in-hard-hats-walki.webp)

24-Hour Commercial Emergency Dispatch

## Planning Similar Work?

Send the building details and we will walk the site, then give you a written scope, price and schedule.

Call (437) 524-2997

[tel:+14375242997 →](tel:+14375242997)

 

Request Service

[/contact/ →](/contact/)

-   TSSA G1+G2, ESA, 313A
-   Written findings every visit
-   90-day / 2-year labour warranty