North York $38,000

# North York Office Tower MUA Full Replacement

A failed 25-year-old make-up air unit replaced over one weekend, with the food court exhaust interlocks and building pressurization rebalanced.

Full replacement of a failed rooftop make-up air unit serving corridors and the ground-floor food court in a Yonge-Sheppard office tower, including crane lift, gas train, controls and airflow balancing.

![New make-up air unit being set on a North York office tower roof](/images/featured/new-make-up-air-unit-being-set-by-crane-on-a-north.webp)

The Challenge

## What the Building Needed

The tower make-up air unit failed in late fall with a cracked burner section and seized blower bearings. Without it, food court exhaust pulled the lobby negative and doors were hard to open.

Our Approach

## How We Did It

1.  01 Assessed the failed unit and confirmed replacement was cheaper than a burner and blower rebuild on a 25-year-old casing.
2.  02 Ordered a direct-fired replacement sized to the measured exhaust airflow, not the old nameplate.
3.  03 Set the new unit by crane on a Saturday and completed gas, electrical and controls on Sunday.
4.  04 Rebalanced supply against food court exhaust and verified the exhaust interlocks.

Results

## Measured Outcomes

-   Building pressurization restored, lobby door issue resolved
-   Replacement completed over one weekend
-   Discharge temperature now trended in the BAS

> "The lobby doors were the first thing tenants complained about and the first thing that was fixed. The swap happened over one weekend."

Thomas Adeyemi, Building Manager

Site Photos

## On the Job

 

More Projects

## Related Projects

![Crane lifting a new rooftop unit onto a Mississauga industrial building](/images/featured/crane-lifting-a-carrier-48tc-rooftop-unit-onto-a-m.webp)

[/projects/mississauga-industrial-park-14-rtu-replacement/ →](/projects/mississauga-industrial-park-14-rtu-replacement/)

Mississauga $420,000

### 

Mississauga Industrial Park 14-RTU Replacement Program

[/projects/mississauga-industrial-park-14-rtu-replacement/ →](/projects/mississauga-industrial-park-14-rtu-replacement/)

Fourteen ageing RTUs replaced building by building on Sunday crane days, with a recalculated load for each tenant space and zero tenant downtime across the six-week program.

Replacement 

Case study

[/projects/mississauga-industrial-park-14-rtu-replacement/ →](/projects/mississauga-industrial-park-14-rtu-replacement/)

![Technicians installing VRF indoor units in a Markham office fit-out](/images/featured/two-technicians-on-ladders-installing-a-vrf-ceilin.webp)

[/projects/markham-tech-campus-vrf-fit-out/ →](/projects/markham-tech-campus-vrf-fit-out/)

Markham $215,000

### 

Markham Tech Campus VRF Fit-Out 24 Indoor Units

[/projects/markham-tech-campus-vrf-fit-out/ →](/projects/markham-tech-campus-vrf-fit-out/)

A two-floor VRF heat recovery fit-out delivered on the tenant improvement schedule, with zone-level control for open office, meeting rooms and a small server room.

Replacement 

Case study

[/projects/markham-tech-campus-vrf-fit-out/ →](/projects/markham-tech-campus-vrf-fit-out/)

![Technicians replacing a rooftop unit on an Etobicoke quick-service restaurant](/images/featured/two-technicians-removing-an-old-rooftop-unit-from-.webp)

[/projects/etobicoke-qsr-32-store-rtu-replacement/ →](/projects/etobicoke-qsr-32-store-rtu-replacement/)

Etobicoke $385,000

### 

Etobicoke QSR 32-Store RTU Age Audit + Replacement Phase 1

[/projects/etobicoke-qsr-32-store-rtu-replacement/ →](/projects/etobicoke-qsr-32-store-rtu-replacement/)

A 32-store RTU age audit that ranked every unit by risk, followed by a phase 1 replacement of the oldest units with zero lost trading days.

Replacement 

Case study

[/projects/etobicoke-qsr-32-store-rtu-replacement/ →](/projects/etobicoke-qsr-32-store-rtu-replacement/)

![](/images/misc/two-commercial-hvac-technicians-in-hard-hats-walki.webp)

24-Hour Commercial Emergency Dispatch

## Planning Similar Work?

Send the building details and we will walk the site, then give you a written scope, price and schedule.

Call (437) 524-2997

[tel:+14375242997 →](tel:+14375242997)

 

Request Service

[/contact/ →](/contact/)

-   TSSA G1+G2, ESA, 313A
-   Written findings every visit
-   90-day / 2-year labour warranty