Mississauga Industrial Park 14-RTU Replacement Program
Fourteen ageing RTUs replaced building by building on Sunday crane days, with a recalculated load for each tenant space and zero tenant downtime across the six-week program.
A 32-store RTU age audit that ranked every unit by risk, followed by a phase 1 replacement of the oldest units with zero lost trading days.
Age and condition audit of rooftop units across a 32-store quick-service restaurant portfolio, followed by phase 1 replacement of the highest-risk units, starting with stores along The Queensway.
The Challenge
The franchise group had no reliable record of unit ages across 32 stores. Breakdowns in July closed dining rooms and drove repair spend, and the capital budget needed a ranked list it could defend.
Our Approach
Results
"For the first time we have every unit age in one sheet. Phase 1 went in overnight and no store missed a lunch rush."
Site Photos
More Projects
Fourteen ageing RTUs replaced building by building on Sunday crane days, with a recalculated load for each tenant space and zero tenant downtime across the six-week program.
A failed 25-year-old make-up air unit replaced over one weekend, with the food court exhaust interlocks and building pressurization rebalanced.
A two-floor VRF heat recovery fit-out delivered on the tenant improvement schedule, with zone-level control for open office, meeting rooms and a small server room.
24-Hour Commercial Emergency Dispatch
Send the building details and we will walk the site, then give you a written scope, price and schedule.