North York Office Tower MUA Full Replacement
A failed 25-year-old make-up air unit replaced over one weekend, with the food court exhaust interlocks and building pressurization rebalanced.
Fourteen ageing RTUs replaced building by building on Sunday crane days, with a recalculated load for each tenant space and zero tenant downtime across the six-week program.
Replacement of 14 end-of-life packaged rooftop units with Carrier 48TC units across a multi-tenant industrial park in the Dixie-Mavis area, including crane lifts, roof adapters, new disconnects and BAS tie-in.
The Challenge
The park had 14 rooftop units between 19 and 24 years old, several on R-22, with repair costs climbing every summer. Tenants ran light manufacturing and warehousing on weekday shifts, so no unit could be down during working hours, and the landlord needed cost allocation per tenant before work started.
Our Approach
Results
"Every lift happened on a Sunday and every tenant had their cost allocation in writing beforehand. We did not get a single complaint call during the program."
Site Photos
More Projects
A failed 25-year-old make-up air unit replaced over one weekend, with the food court exhaust interlocks and building pressurization rebalanced.
A two-floor VRF heat recovery fit-out delivered on the tenant improvement schedule, with zone-level control for open office, meeting rooms and a small server room.
A 32-store RTU age audit that ranked every unit by risk, followed by a phase 1 replacement of the oldest units with zero lost trading days.
24-Hour Commercial Emergency Dispatch
Send the building details and we will walk the site, then give you a written scope, price and schedule.