Mississauga Industrial Park 14-RTU Replacement Program
Fourteen ageing RTUs replaced building by building on Sunday crane days, with a recalculated load for each tenant space and zero tenant downtime across the six-week program.
A two-floor VRF heat recovery fit-out delivered on the tenant improvement schedule, with zone-level control for open office, meeting rooms and a small server room.
Daikin VRV heat recovery fit-out for two office floors on a Hwy 404 tech campus: 24 indoor units, branch selector boxes, refrigerant piping, pressure testing, controls and commissioning.
The Challenge
The tenant needed simultaneous heating and cooling across open office, meeting rooms and a server room, inside a fixed TI schedule and a ceiling space shared with sprinkler and electrical trades.
Our Approach
Results
"Their piping drawings were done before rough-in, so we had no clashes with the sprinkler trade. Every zone worked on day one."
Site Photos
More Projects
Fourteen ageing RTUs replaced building by building on Sunday crane days, with a recalculated load for each tenant space and zero tenant downtime across the six-week program.
A failed 25-year-old make-up air unit replaced over one weekend, with the food court exhaust interlocks and building pressurization rebalanced.
A 32-store RTU age audit that ranked every unit by risk, followed by a phase 1 replacement of the oldest units with zero lost trading days.